On Jun 16th, CCWCD’s Board of Directors awarded AB Underground, located in LaSalle, Colorado, the construction contract for the Phase 3A of Central’s Walker Recharge Project. Phase 3A of the Walker Recharge project encompasses the manifold pipeline that will tie together the 13-alluvial wells located on Central’s riverfront property to the 54-inch steel pipeline, currently under construction, for delivery to recharge ponds on top of Bijou Hill. As a part of Phase 3A, Central will install approximately 6,500 feet of HDPE pipe that ranges in size from 12-inch to 42-inch. The design capacity of the manifold pipeline from the 13-alluvial wells is approximately 65 cfs.